Allara Estate

Project

Allara Estate (stage 12, 15, 13 and 13 Bulk Earthworks)

Client

Satterley/DevWA

Consulting Engineer

Stantec

Wormall Civil Project Management

Nick White

Wormall Civil Site Supervision

Trevor Prescott (Civil) Dallas Jones (Bulk Earthworks)

Project Duration

Current stages 2021 – ongoing

Description

Civil sub-division and Bulk earthworks project located in the Eglington area of Perth, Bulk earthworks currently underway includes over 500,000m3 of cut to fill and placement of clean fill for future civil works areas. Current civil stages are 12, 15 and 13 all at different stages of progression. Site is located on a limestone formation prevalent to the area which has provided challenges in the earthworks as well as the installation of deep sewer and other undergrounds services

Main scope as follows:

  • Clearing
  • BEW cut to fill of insitu rock material, placed 500mm below finished level, with clean fill placed in top 500mm
  • All clean fill mined from locations on site
  • Installation of all undergrounds
  • Civils works
  • Retaining walls, stages 12 and 13 have in excess of 18,000 blocks per stage.

Project

Allara Stage 9

Client

Satterley Property Group

Consulting Engineer

Stantec

Wormall Civil Project Management

Daniel R Strickland

Wormall Civil Site Supervision

Project Duration

August 2020 - December 2020

Description

Allara estate is located in Eglinton, approx 20mins North of Joondalup. The 37-lot stage sits alongside the previous Stg 7 and Stg 8 completed by Wormall and included shifting large stockpiles of materials to make way for the new lots.

There was a large amount rock found in the trenches which required us to mobilise our 45 tonne excavator to rip through. Once the rock was dealt with, the sewer, drainage, common trench and roadworks went ahead with no hiccups and the job was wrapped up just prior to the Christmas break.