Cape Rise Estate, Dunsborough
Project
Cape Rise Estate, Dunsborough
Client
Andrew & John d'Espeissis
Consulting Engineer
WML Consultants
Wormall Civil Project Management
Tinus Spangenberg
Wormall Civil Site Supervision
Graham Broom
Project Duration
August 2020 - January 2021
Description
Cape Rise stage 1 providing 18 lots consisted of the following:
- 16,000m3 imported fill
- 570m of limestone retaining wall
- 280m of drainage pipe with pits and 800m of subsoil drainage
- Culvert under access road to accommodate existing stream flow
- 4500m2 red and black asphalt with 600m of concrete footpath
- 650m of water main
- Electrical power supply and streetlights along with communication network
- Bore under Cape Naturaliste Drive to connect sewer to existing outfall