Jindee

Project

Jindee

Client

Jindee Development Pty Ltd C/O EDC

Consulting Engineer

Stantec & Omeo Consulting

Wormall Civil Project Management

John Barry

Wormall Civil Site Supervision

Chris Nelson

Project Duration

40 weeks

Description

Jindee nestles between two natural limestone ridges that run down to the Indian Ocean. Along the kilometer of Jindee’s ocean frontage there are long white sandy beaches, small intimate sandy coves and beautiful rocky outcrops. It’s an ancient transition from land to water with ever-changing colours and effects tempered by seasons and weather.

Jindee embodies this essence of Western Australia. Its relaxed, unhurried and generous in spirit. It’s like being on holiday 365 days a year.

Wormall Civil proudly provided the below works:

  • Bulk Earthworks- both onsite & offsite which included large rock portion
  • Underground service installation
  • Sewer installation with an intricate offsite component with the requirement for pipe jacking and the need to make a connection 11m deep
  • Drainage including twin barrel 750 lines
  • Water
  • Gas
  • Power
  • Retaining Walls
  • Roadworks