Brightwood East Stage 2
Project
Brightwood East Stage 2
Client
Parcel Property
Consulting Engineer
Pritchard Francis
Wormall Civil Project Management
Justin Fitzpatrick
Wormall Civil Site Supervision
Ben Johnson
Project Duration
Ongoing
Description
Brightwood East Stage 2 is located between Baldivis Road and the Kwinana Freeway in Baldivis, approximately 1km north of Karnup Road. With a world class Adventure Park, schools and shops all close by, Brightwood is the perfect place to call home.
Wormall Civil are proud to be apart of such an exciting development.
Project scope entails:
- 500m Retaining Walls, including 200m of construction next to the APA Gas Corridor
- 660m Sewer Reticulation
- 760m Stormwater and Subsoil
- 545m Water and Gas Reticulation
- 930m of Power supply and streetlighting, along with 1220m of Communication Installation
- 4400m2 Asphalt
- 1300m2 Footpath and 1085m of kerbing