The Village Stage 49

Project

The Village Stage 49

Client

Peet

Consulting Engineer

TABEC

Wormall Civil Project Management

John Barry

Wormall Civil Site Supervision

Brent Walker

Project Duration

24 weeks

Description

The Village Stage 49 is one of the final stages at Wellard which runs off Ebrington and is Nestled between the Leda Nature Reserve and 2 Public open Space areas designed to incorporate the large mature native trees into the overall design of the stage .This continues Peet, TABEC and City of Kwinana’s commitment to tree retention aiding to a more environmentally friendly and sustainable suburb.

Wormall Civil’s Works:

  • Earthworks
  • Sewer Installation
  • Extensive drainage installation
  • Western Power Enabling Works
  • Underground Power + Comms installation
  • Water and Gas
  • Retaining Walls
  • Roadworks