The Village

Project

The Village Wellard

Client

Peet Southern JV Pty Ltd

Consulting Engineer

TABEC

Wormall Civil Project Management

Daniel Lamb

Wormall Civil Site Supervision

Project Duration

2020 - ongoing

Description

Wormall Civil are pleased to have been awarded multiple stages at The Village in Wellard.

All stages include cut to fill and installation of underground services along with retaining walls and roadworks. The retention of existing trees is a big focus at The Village. All works are being completed around existing trees. The existing trees are being protected throughout all of the works and will be a beautiful feature that will complement the completed subdivisions.

The Village Stage 49 is one of the final stages at Wellard which runs off Ebrington and is Nestled between the Leda Nature Reserve and 2 Public open Space areas designed to incorporate the large mature native trees into the overall design of the stage .This continues Peet, TABEC and City of Kwinana’s commitment to tree retention aiding to a more environmentally friendly and sustainable suburb.

Wormall Civil’s scope of works across multiple stages include:

  • Earthworks
  • Sewer Installation
  • Extensive drainage installation
  • Western Power Enabling Works
  • Underground Power + Comms installation
  • Water and Gas
  • Retaining Walls
  • Roadworks