The Village
Project
The Village Wellard
Client
Peet Southern JV Pty Ltd
Consulting Engineer
TABEC
Wormall Civil Project Management
Daniel Lamb
Wormall Civil Site Supervision
Project Duration
2020 - ongoing
Description
Wormall Civil are pleased to have been awarded multiple stages at The Village in Wellard.
All stages include cut to fill and installation of underground services along with retaining walls and roadworks. The retention of existing trees is a big focus at The Village. All works are being completed around existing trees. The existing trees are being protected throughout all of the works and will be a beautiful feature that will complement the completed subdivisions.
The Village Stage 49 is one of the final stages at Wellard which runs off Ebrington and is Nestled between the Leda Nature Reserve and 2 Public open Space areas designed to incorporate the large mature native trees into the overall design of the stage .This continues Peet, TABEC and City of Kwinana’s commitment to tree retention aiding to a more environmentally friendly and sustainable suburb.
Wormall Civil’s scope of works across multiple stages include:
- Earthworks
- Sewer Installation
- Extensive drainage installation
- Western Power Enabling Works
- Underground Power + Comms installation
- Water and Gas
- Retaining Walls
- Roadworks