Thomas Road Casuarina Stage 1 BEW
Aigle Royal
Cossil & Webley
Mike O'Donoghue
2019 - Onwards
Casuarina Industrial Estate is approximately 32km from Perth CBD and is located just off the Thomas Rd exit off the Kwinana Freeway.
Project Scope;
Clearing, downsizing and mulching
Topsoil strip, screening and blending
Cut to fill – 30,000m3
Import Fill – 370,000m3
Realigment of existing Peel Main Drain – including;
almost 1 km of excavation up to 4m deep.
Stormwater drainage pipe up to 600mm dia.
Various different types of drainage pits and headwalls.
Formation of drainage basins and living stream.
"*" indicates required fields