Trinity Estate (stages 34A, 40A and 37/38 BEW
LWP
GHD
Nick White
Iain Keay
Current stages 2022 – ongoing
Civil sub division and Bulk earthworks project located in the Alkimos area of Perth, Bulk earthworks currently underway required the cut of a local dune formation for future civil stages. Current civil stages are 34A and 40A with 34B to come online before Christmas 2022. 40A required a lot of work in conjunction with the Water Corporation due to the complexity of the sewer design.
Main scope as follows:
"*" indicates required fields