Trinity Estate

Project

Trinity Estate (stages 34A, 40A and 37/38 BEW

Client

LWP

Consulting Engineer

GHD

Wormall Civil Project Management

Nick White

Wormall Civil Site Supervision

Iain Keay

Project Duration

Current stages 2022 – ongoing

Description

Civil sub division and Bulk earthworks project located in the Alkimos area of Perth, Bulk earthworks currently underway required the cut of a local dune formation for future civil stages. Current civil stages are 34A and 40A with 34B to come online before Christmas 2022. 40A required a lot of work in conjunction with the Water Corporation due to the complexity of the sewer design.

Main scope as follows:

  • Clearing
  • BEW cut to fill of insitu material.
  • All clean fill mined from locations on site
  • Installation of all undergrounds
  • Civils works
  • Retaining walls, retaining walls, including stairs all require concrete upstands