Brightwood East Stage 2

Project

Brightwood East Stage 2

Client

Parcel Property

Consulting Engineer

Pritchard Francis

Wormall Civil Project Management

Justin Fitzpatrick

Wormall Civil Site Supervision

Ben Johnson

Project Duration

Ongoing

Description

Brightwood East Stage 2 is located between Baldivis Road and the Kwinana Freeway in Baldivis, approximately 1km north of Karnup Road. With a world class Adventure Park, schools and shops all close by, Brightwood is the perfect place to call home.

Wormall Civil are proud to be apart of such an exciting development.

Project scope entails:

  • 500m Retaining Walls, including 200m of construction next to the APA Gas Corridor
  • 660m Sewer Reticulation
  • 760m Stormwater and Subsoil
  • 545m Water and Gas Reticulation
  • 930m of Power supply and streetlighting, along with 1220m of Communication Installation
  • 4400m2 Asphalt
  • 1300m2 Footpath and 1085m of kerbing