Wormall SouthWest is completing the civil engineering on Hamelin Ridge Stage 3

Name of Project: Hamelin Ridge Stage 3
Consulting Engineer: WML
Client: Hamelin Ridge Pty Ltd
Wormall Civil Project Manager: Tinus Spangenberg
Wormall Civil Site Supervisor: Bryce Wills 

Wormall Civil is excited to be completing the civil engineering work at the stunning The Ridge at Hamelin Bay.  

The Ridge at Hamelin Bay is situated on the coast between Cape Leeuwin and Cape Naturaliste at the centre of the Margeret River wine region.  

The Ridge at Hamelin Bay enjoys direct access to the Leeuwin Naturaliste Park, Cape to Cape Walk and a 3-minute drive to the village of Karridale, Hamelin Bay beach and boat ramp. 

Wormall Civil are completing the below scopes of work: 

  • 2630m3 cut to fill
  • 2900m2asphalt road 
  • 95m drainage pipe
  • 1480mof power  
  • 954mcommunication network 

Images for Hamelin Bay are courtesy of Survcon.

civil engineering

civil engineering

SHARE THIS NEWS
Scroll to Top