Feature Project: Peel Business Park Stage 2 

Name of Project: Peel Business Park Stage 2 
Consulting Engineer: Cossill & Webley 
Client: DevelopmentWA 
Wormall Civil Project Manager: Ansh Panthi 
Wormall Civil Site Supervisor: Jos Van Dijk 

Peel Business Park Stage 2 is the continuation of the industrial development in the Peel Region by the state government located at the Lakes Road exist on Kwinana Freeway.  

Stage 1 of the development was completed by Wormall Civil in 2021 and Stage 2 of the development is currently underway and is slated to be completed in December 2023. 

Together with the Industrial Park development, Lakes Road the Osprey link intersection has also been upgraded to provide better flow of traffic and to cope up with the future demand of the region. 

The most challenging part of the development has been the large number of deep services installed – up to 6m deep – while managing ground water that is only 500mm to 1m deep in the area. 

Scope of works completed by Wormall Civil: 

  • Approx 100,000m3 ofsand import 
  • 1350m of stormwater drainage of varying pipe sizes up to 900mm in diameter
  • 2500m of subsoil drainage utilising the SmartstreamTechnology Poo Pits 
  • 1000m of sewer main at various depths upto 6m deep 
  • 800m of water main and 800m gas main of varying pipe sizes
  • 5,300m of power cables and 2000m of NBN Works
  • 14,500m2 of roadworks